ES3 provides specialized engineering servicing of the F-16 Canopy Sill Longeron.
ES3 will perform all preparation, repair or replace the canopy sill longeron, along with all build-up requirements for this effort. General procedures on aircraft include:
Removing side skin fasteners
Removing associated brackets and secondary structure
Removing the Canopy Sill Longeron
Creating templates for fastener location
Drilling up located fasteners on bench
Locating Canopy Sill Longeron within structure
Back drilling remaining fastener holes
Reinstalling all components
Training can be provided as an option if requested.